|
Newsletters
|
|
|
|
|
WirelessDevNet Career Center
Jobs Wanted/Resumes (Experienced)
|
Continue Browsing Entries
|
| Desired Position: |
PDH,STM,DWDM,SONET,CCNA,LAN,WAN |
Job Code: |
WDN-2-11540 |
| Reply to Email: |
|
Website: |
|
| Preferred Location: |
Anywhere |
|
| Posted on: |
2006-09-02 |
|
| Qualifications: |
1.CCNA Certified. 94%
2.CDAC, Pune 72% 2001
Post Graduate course in Advanced Computing
3.Malviya Regional Engineering College (MNIT), 66% 2000
B.E. (Electronics & Communication), Jaipur
4.HSC 76% 1995
Board of Rajasthan.
5.SSC 79% 1993
Board of Rajasthan
EXPEREIENCE-: Five Years Working experience In BHARAT SANCHAR NIGAM LIMITED
1.Four Years installation and commissioning experience of different Transmission System like PDH, SDH (STM-1/4/16) Fibcom, and ITI &TEJAS make Systems. Adding & Dropping of payload between nodes, Mapping of E1 Trib (Cross Connection) into TU-12, TUG-2, TUG-3, STM-N (Virtual Concatenation) through software configuration, ring protection. Utilize external clock for better synchronization. , Fault/Performance management and analyzing through equipment software.
2. Installation & maintenance of DLC Systems. Normal Subscriber, leased line, ISDN creation. Create V5.2 link between COT and its ROTs (connected in a ring).
3. Leased Line Installation and Maintenance (9.6kbps to STM-1 level). Modems installation and testing, planning of network, commissioning of Channelised E1, while reducing separate 64 Kbps line. Good understanding of all testing equipment like ANT-20 PFA Channel analyzer, Line tester.
4. OFC Maintenance like fault tracing, fiber splicing etc. Fault tracing of OFC breakdown. Splice fiber (single mode or multimode). Ducting and Trenching of Optical fiber cable. Calculate attenuation loss with the help of optical meter like OTDR, power source and power meter.
5.Working experience of PCM tester. Measuring PCM stability through SDH analyzer (Ant-20, Victoria) like ES, SES, EFS, UAS etc. Calculate zitter tolerance, phase distortion, frequency measurement, and synchronization tests.
5.Installation and commissioning of UHF link |
|
|