|
Newsletters
|
|
|
|
|
WirelessDevNet Career Center
Jobs Wanted/Resumes (Experienced)
|
Continue Browsing Entries
|
| Desired Position: |
Wireless Technition |
Job Code: |
WDN-2-13226 |
| Reply to Email: |
|
Website: |
|
| Preferred Location: |
Southern California |
|
| Posted on: |
2006-12-18 |
|
| Qualifications: |
Resume of Don Harris
10132 Sherrill
Anaheim Ca. 92804
Home Phone: 714-995-8092
Cell: 714-757-0261
Objective: To obtain a position as a Cell Site Technician.
Technical Qualifications:
• Ericsson GSM 2102-2106 Certified by Ericsson
• Ericsson GSM Basics and Maintenance
• T-1 troubleshooting and testing
• True Position E911
• Cats Training
• Pathmaster
• TG Synchronization
• Cell Booster Installation
Employment:
August 11 to December 31, 2005 Cingular Wireless Los Angeles, CA
Wireless Technician
• Performed E911 prep work for LMU integration.
• Ran 24v power/ground for the LMU, Pathmasters, KDI’s, ASU’s, DSU’s, and WLS.
• Responsible for GSM cell site being halted and brought back online during maintenance window via the RNOC, FSD, and local switch.
• Responsible as well for daily reports, keeping inventory all equipment.
• Performed the full installation, integration, and configuration of, LMU’s KDI’s, WLS, ASU’s, CSU’s, NIU’s Pathmasters, running and termination of T-1 lines, RF cables, Coax jumpers, power and ground.
•
• Integration, testing, and installation of Ericsson GSM RBS equipment such as: 2206(indoor cabinets),2106(outdoor cabinets w/batteries),2308 & 2109 (Microcells) and 2250 (HCHC High capacity High coverage)
2001 to Aug. 11, 2003 EXI Parsons
Wireless Technician
• Testing, turn-up, integration, and troubleshooting of Ericsson Macros and Micros.
• Commission 2102-2106 cabinets from installation to integration.
• Integration, testing, and installation of Ericsson GSM RBS equipment such as: 2206 indoor cabinets, 2106 outdoor cabinet’s w/batteries, 2308 & 2109 Microcells.
• Coordinate with Ericsson and Cingular switches prior and during cut to insure that integration was complete.
• Read technical manuals to learn correct settings for equipment.
• Was instrumental in OMT required for integration from laptop.
• Trained new installers on installation practices and standards for Ericsson and Cingular.
• Inspected and tested wiring to locate and repair problem.
• Tested communication lines to ensure that specifications were met, using testing instruments such as voltmeter.
• Entered commands into computer to test equipment.
• Read messages on computer screen to verify that data was being transmitted between locations according to specifications.
1995 to 2001 Ericisson Wireless
Wireless Technician
• Testing, turn-up, integration, and troubleshooting of Ericsson Macros and Micros.
• Commission 2102-2106 cabinets from installation to integration.
• Integration, testing, and installation of Ericsson GSM RBS equipment such as: 2206 indoor cabinets, 2106 outdoor cabinet’s w/batteries, 2308 & 2109 Microcells.
• Coordinate with Ericsson and Cingular switches prior and during cut to insure that integration was complete.
• Read technical manuals to learn correct settings for equipment.
• Was instrumental in OMT required for integration from laptop.
• Trained new installers on installation practices and standards for Ericsson and Cingular.
• Inspected and tested wiring to locate and repair problem.
• Tested communication lines to ensure that specifications were met, using testing instruments such as voltmeter.
• Entered commands into computer to test equipment.
• Read messages on computer screen to verify that data was being transmitted between locations according to specifications.
Education:
High School |
|
|