Name : Arvin D. Enerio
Address : 2470 P. Santiago St., Pasay City 1300,Philippines
Contact Numbers : +639066529953/+639193295805
Email Address : arvinenerio@gmail.com
Highlights of Qualifications
 Commissioning, Testing and Installation of Ericsson RBS and Minilink Equipment
 Radwin Certified Engineer for operation and maintenance
 Commissioning, Integration and Installation of RAD Egate-100 and Rate Interface Converter-4E1
 Commissioning, Integration and Installation of Airmux-200/Radwin IP Radio equipment (802.11)Wimax (Worldwide Interoperability for Microwave Access)
 Motorola CPE and BTS Installation
 Commissioning, Testing and Installation of ECI BG 20 equipment
 Field and Drive Testing using Panasonic mobile application
 Onsite survey in BTS and MSC for co-location and new facility for RAD Equipments
 Survey of Switching and Transmission Network
 Operation and Maintenance of Siemens EWSD CP113 Switch Equipment
 Operation and Maintenance of NEC Neax61eV Switch Equipment
 Optical Time Domain Reflectometer (OTDR) testing in Fiber optics
 Able to design a microwave communications network using a Pathloss 4.0 software
 Installation and configuration for Local Area Network
Vendor and Technology Experience
 Ericsson RBS 2216 and Minilink Radio
 Radwin IP radio
 Airmux-200 IP radio
 RAD Egate-100 and RICi-4E1 Equipments Commissioning and Integration in cellular network infrastructure
 Motorola Canopy CPE and BTS Installation for Wireless Broadband
 ECI BG 20 Equipment
 Panasonic Mobile Handsets Interoperability (IOT) Testing
 Siemens EWSD CP113 Switch Operation and Maintenance
 Siemens SDH STM-1 Transmission Operation and Maintenance
 NEC Neax61EV Switch Equipment Operation and Maintenance
 OPCOM AFL Telecommunications portable OTDR Tester
 GPS 60 GARMIN [Global Positioning System] device
 Pathloss 4.0 software
Work Experience
Company : Fibercom Telecom Philippines Inc.
Project : Ericsson RBS and Minilink Radio project
Operator/Vendor : Sun Cellular
Location : Roxas, Capiz Philippines
Date : December 9 2007 to Present
 Installation and configuration of RBS 2216 and Minilink Radio
 Testing and commissioning of RBS 2216 and Minilink Radio
 Make a daily accomplishment report and report it to the Project Manager
 Coordinate Ericsson personnel regarding status of the site
 Prepare a provisional acceptance test
Company : Fibercom Telecom Philippines Inc.
Project : IP Radio Network
Operator/Vendor : Smart Communications Inc.
Location : Manila, Philippines
Date : May 2007 to Present
Responsibilities:
 Onsite survey for Airmux-200 IP Radio Equipments to be installed in BTS sites
 Installation and configuration of Airmux-200 IP Radio in BTS.
 Testing of Airmux-200 IP Radio RAD equipment
 Commissioning of Airmux-200 IP Radio RAD equipment
 Prepare provisional acceptance test
 Lead a team during installation, testing and commissioning
 Coordinate Smart Field Officers during testing and commissioning before provisional acceptance is made
 Prepare a path profile LOS of all sites surveyed viable to install an IP radio using Pathloss 4.0 software
 Prepare all As-built layout of RAD equipments soft and hard copy installed in BTS and MSC sites prior for submission to the client
 Involved also in OSP survey for fiber drop cable installation from post to post.
Company : Fibercom Telecom Philippines Inc.
Project : Wireless Broadband E1 Upgrade
Operator/Vendor : Smart Communications Inc.
Location : Manila, Philippines
Date : July 2006 to Present
Responsibilities:
 Onsite survey for RAD Equipments to be installed in BTS and MSC sites
 Installation and configuration of Cat5-e UTP,DDF,RAD Egate-100 and RICi-4E1 in BTS and MSC
 Testing of RAD Egate-100 and RICi-4E1 equipment
 Commissioning of RAD Egate-100 and RICi-4E1 equipment
 Prepare provisional acceptance test
 Lead a team during installation, testing and commissioning
 Coordinate Smart Field Officers during testing and commissioning before provisional acceptance is made
 Prepare all As-built layout of RAD equipments soft and hard copy installed in BTS and MSC sites prior for submission to the client
Company : Panasonic Mobile Communications Corporation of the Philippines
Project : Introduction to New Mobile Phone Handsets 2004 and 2005
Operator/Vendor : Panasonic Mobile Communications Inc.
Location : Sta. Rosa Laguna ,Philippines
Date : April 2004 to March 2006
Responsibilities:
 Performed software field testing for new mobile phones covering Asia
(Taiwan, Malaysia, Singapore, Hongkong, Thailand,India,Indonesia and Vietnam etc.) and Oceania regions (Australia and New Zealand) using different 2G,2.5G networks based on GSM ,GPRS,3GPP specifications, protocols and requirements
 Checked and verified customization files based on customization sheets including phone functions and features for different handset models
 Managed bugs found during evaluation and reconfirms when there are software releases
 Monitor sample used for field testing, type approval ,operator and sales evaluations
 Extracted and took crash and modem log files using logging tools for analysis and debugging of the software team
 Coordinated with sales companies regarding issues confirmation, concerns regarding target schedules and other related matters
 Obtained Type approval/Operator approval/Customer acceptance for software releases that are found suited for mass production
 Handled new model based on pre-launch requirements and procedures to meet target date of introduction
 Performed network signaling test in TCP/ IP and application protocols.
 Developed test plans and procedures with the help of its members in the department based on product specification from the new mobile handset model prior for testing.
 Conducted connectivity and compatibility test ( USB, Mini SD Card, RS232, IrDA, Bluetooth, AT-Commands).
 Conducted performance tests, IOT Test, Field Test before the new mobile handset model is mass produced.
Test Equipment and Software/Planning Tool Proficiency
 Site Master Anritsu S331B
 Signalling Advisor
Agilent Technologies
 Optical Time Domain Reflectometer (OTDR) tester
OPCOM / AFL Telecommunications
 GPS 60 (Global Positioning System)
GARMIN
 Flash Tools and phone tools for Panasonic mobile handsets
 Pathloss 4.0
 Acterna FST-2802 Test Pad
Trainings Attended
 Radwin IP Radio
 RAD Egate-100 and RICi-4E1 Installation
RAD Data Communications (HK)
Paranaque Philippines, August 2006
 Airmux-200/Radwin IP radio installation and configuration
Fibercom Telecom Philippines Inc.
 Motorola Canopy CPE/BTS/AP 5.7Ghz Installation and configuration
Smart Communications Inc.
 NEC Pasolink NEO Installation,Testing and Commissioning (Supervisor Course)
NESIC Philippines Inc.
Makati Philippines, May 2006
 In House Training on EWSD CP113 switching system, SDH transmission system
Philippine Global Communications Inc.
Makati Philippines , February 2003
 Cisco Basic Configuration
Philippine Global Communications Inc.
Makati Philippines, February 2003
 Advanced Hardware Training - NEAX61-EV Switch Equipment
Nippon Electric Corporation (NEC)